Download

Tutor Perini Corporate Compliance Manual

For your reference

Categories: T2 Tunnel

Download

Trust Fund Reciprocal Agreement

All travellers working in the 993 jurisdiction must complete this form and sent it to the 993 office for authorization to reciprocate your welfare and retirement funds to your home local.
Email completed form to office@ibew993.org or fax to (250) 376-8136


Download

T2 Tunnel PLA

Project Labour Agreement between Frontier Kemper-Aecon Joint Venture and Poly-Party Union

Construction and Specialized Workers Union, Local 1611
International Union of Operating Engineers, Local 115
International Brotherhood of Electrical Workers, Local 993

For Rio Tinto Kemano T2 Project H353008

July 2017

Categories: Agreements, T2 Tunnel

Download

T2 Tunnel Basic Job Information

Lay out of what you can except and what to bring (this will be changing when the boat schedule changes)

Categories: T2 Tunnel

Download

Schedule A: Wage & Benefit Calculations

Letter of Understanding #3 by and between Construction Labour Relations Association of BC on its own behalf and on behalf of Fluor Constructors Canada Ltd and Bargaining Council of British Columbia Building Trades Unions.


Download

LNG Canada MOU

Memorandum of Understanding for the LNG Canada Project By and Between Construction labour Relations Association of BC On its own behalf and on behalf of Fluor Constructors Ltd. and Bargaining Council of British Columbia Building Trades Unions


Download

Kikinaw Energy PLA & Wage Package

Categories: Agreements, Site C


Download

IBEW – Inside Wiremens Agreement – Trade Level Memorandum of Agreement


Download

Houle Site C Enabling Letter

Categories: Agreements, Site C

Download

GRSP – Group Retirement Savings Plan Application Form

All travellers from outside of BC (other than 424) working in the 993 jurisdiction must complete this form.
Email completed form to office@ibew993.org or fax to (250) 376-8136


Download

Frontier-Kemper Hourly New Hire Pack

Fill out accordingly and email back to Frontier-Kemper contact person prior to the departure for your first shift including:

  1. Copy of Government issued ID
  2. Copy of direct deposit slip or void chq
Categories: T2 Tunnel

Download

F&M Installations Site C Enabling Letter

Categories: Agreements, Site C

Download

Construction Industry of BC Substance Abuse Testing & Treatment Program Policy


Download

Civeo Sitka Lodge MOU


Download

Booking a D&A Test Appointment – Fluor Kitimat LNG

This form shows you the steps for booking your own drug and alcohol test. This should be done immediately after being confirmed for a call.