Weekly Bus Schedule – Effective May 12, 2020

Download

Tutor Perini Corporate Compliance Manual

For your reference

Download
Categories: T2 Tunnel

Trust Fund Reciprocal Agreement

All travellers working in the 993 jurisdiction must complete this form and sent it to the 993 office for authorization to reciprocate your welfare and retirement funds to your home local.
Email completed form to office@ibew993.org or fax to (250) 376-8136

Download

T2 Tunnel PLA

Project Labour Agreement between Frontier Kemper-Aecon Joint Venture and Poly-Party Union

Construction and Specialized Workers Union, Local 1611
International Union of Operating Engineers, Local 115
International Brotherhood of Electrical Workers, Local 993

For Rio Tinto Kemano T2 Project H353008

July 2017

Download
Categories: Agreements, T2 Tunnel

T2 Tunnel Basic Job Information

Lay out of what you can except and what to bring (this will be changing when the boat schedule changes)

Download
Categories: T2 Tunnel

Special Project Needs Agreement – Site C Turbines & Generators

SPECIAL PROJECT NEEDS AGREEMENT
for the
SITE C CLEAN ENERGY PROJECT – SUPPL V AND
INSTALLATION OF TURBINES AND GENERATORS

Download
Categories: Site C

Site C Clean Energy Project – Generating Station and Spillway Balance of Plant

Download
Categories: Agreements, Site C

Schedule A: Wage & Benefit Calculations

Letter of Understanding #3 by and between Construction Labour Relations Association of BC on its own behalf and on behalf of Fluor Constructors Canada Ltd and Bargaining Council of British Columbia Building Trades Unions.

Download

READ THIS SECOND – LNGC Project FCCL Onboarding Requirements Revised June 2020

This document is specific to Fluor

Download

READ THIS FIRST – Welcome to Fluor

This document is specific to Fluor

Download

Park and Ride Kitimat Local Residents

Bussing pick up location for local residents in Kitimat

Ask for the orientation bus.

Kitimat pick-up time is 6:30 am

Parking is located behind the retirement home between Mountainview sq and Lanhakas Blvd S near the Save on Foods location as per attached picture.

Park and Ride Terrace Local Residents

Ask for the orientation bus.

Terrace pick-up time is 5:30 am

Bussing Pick Up location for local residents Terrace. Parking is located near Bristol Rd and Wood Way.

 

Download

LNG Canada Wage Rate Effective May 1, 2020

Download

LNG Canada MOU

Memorandum of Understanding for the LNG Canada Project By and Between Construction labour Relations Association of BC On its own behalf and on behalf of Fluor Constructors Ltd. and Bargaining Council of British Columbia Building Trades Unions

Download

Latest Inside Electrical Workers Collective Agreement (Searchable)

The latest version of the Inside Electrical Workers Collective Agreement between Construction Labour Relations Association of BC and Local Unions 213, 230, 993, 1003 of the International Brotherhood of Electrical Workers.

May 1, 2019 to April 30, 2023

This version of the agreement has been made searchable for convenience.

Download

Latest Inside Electrical Workers Collective Agreement (Original)

The latest version of the Inside Electrical Workers Collective Agreement between Construction Labour Relations Association of BC and Local Unions 213, 230, 993, 1003 of the International Brotherhood of Electrical Workers.

May 1, 2019 to April 30, 2023

This is the original scanned version of the agreement has not been made searchable. This version is suitable for printing or referring to in the result of an OCR issue.

Download

Kikinaw Energy PLA & Wage Package

Download
Categories: Agreements, Site C

Houle Site C Enabling Letter

Download
Categories: Agreements, Site C

GRSP – Group Retirement Savings Plan Application Form

All travellers from outside of BC (other than 424) working in the 993 jurisdiction must complete this form.
Email completed form to office@ibew993.org or fax to (250) 376-8136

Download

Frontier-Kemper Hourly New Hire Pack

Fill out accordingly and email back to Frontier-Kemper contact person prior to the departure for your first shift including:

  1. Copy of Government issued ID
  2. Copy of direct deposit slip or void chq
Download
Categories: T2 Tunnel

FINAL SPNA for Site C Turbines and Generators

Download
Categories: Agreements, Site C

F&M Installations Site C Enabling Letter

Download
Categories: Agreements, Site C

Construction Industry of BC Substance Abuse Testing & Treatment Program Policy

Download

Civeo Sitka Lodge MOU

Download