-
-
Dawson Creek Hospital
The Dawson Creek Hospital Replacement Project in Dawson Creek BC is a new, state-of-the-art hospital to address current and future health and patient care needs. The work schedule is 14 days on, 7 days off, 10 hours/day. Fall pro AWP Own Transportation to site Working from heights Rough in Conduit work Wire pulling New hospital…
-
Grievances
You should get in touch with the IBEW Business Rep that is managing the jobsite
-
-
Site C Dam
The Site C Dam is a project of BC Hydro for a large-scale earth fill hydroelectric dam on the Peace River near Fort St. John in northeastern British Columbia, Canada. The site is downstream from the existing W.A.C. Bennett and Peace Canyon dams. Designs call for an estimated peak capacity of approximately 1,100 MW, average…
-
Mica Dam
The Mica Dam is a hydroelectric dam spanning the Columbia River 135 kilometres north of Revelstoke, British Columbia, Canada, as one of three Canadian projects built under the terms of the Columbia River Treaty. Completed in 1973 under the terms of the 1964 Columbia River Treaty, the Mica powerhouse has a generating capacity of 1,805…
-
G.M. Schrum Generating Station at W.A.C. Bennett Dam
The W. A. C. Bennett Dam is a large hydroelectric dam on the Peace River in northern British Columbia, Canada. At 183 metres (600 ft) high, it is one of the world’s highest earth fill dams. Construction of the dam began in 1961 and culminated in 1968. At the dam, the Finlay, the Parsnip and…
-
Bater Electric Shop in Prince George
Bater Electric is a winding shop in Prince George
-
Houle Electric Shop In Prince George
The Houle shop in Prince George does work on various projects in the Prince George area and has a full service department.
-
Sasco Contractors Shop in Kamloops
The Sasco shop in Kamloops does work on various projects in the Kamloops area
